What is a safe work method statement? A safe work method statement for excavation improves excavation operations in a number of ways. Firstly, it enables a company to document its actual process which requires thinking through and establishing the best and most feasible control measures. It documents the work to be carried out at a workplace, hazards associated with these activities, and the control measures to put in place to mitigate the risks.

Below is given a safe work method statement for performing the excavation works for different purposes like piping, trenching, man hole and cable laying etc. The procedure is given in main steps and other considerations must be kept in the view. Ensure all clearances from the concerned government department are obtained. Preparation of work area for Excavation.
Erect warning signs to warn others of excavations or trenches and the associated risks. Excavation is the process of creating space by removing earth (soil or rock) to place a utility or structure. Several methods are available to achieve excavation. In all methods, excavation safety plays a crucial role.

Some popular methods of excavation are: 1. Horizontal Directional Drilling 4. Microtunneling for Pipe Jacking 5. Pile foundations and diaphragm walls 6. Vibro stone columns 7. See full list on resources. Any open excavation deeper than 1. This method statement describes the excavation safety requirements and safe work procedure for all open excavations. It summarizes suggested method of executing works safely within any constraints. The scope of this document covers: 1. Safe work method and procedure for carrying open excavation works 2. Materials , equipment , and tools needed to carry out the excavation activity 3. Get relevant data of subsurface soil and water table location 2. Design excavation sides and protective system based on the size of excavation and type of soil.
Three popular methods to protect excavation sides are: 1. Sloping the walls 2) Bench Excavation3) Supported excavation by shoring up the walls with wood or metal supports 1. Finalize excavation and soil removal method namely mechanically or manual 2. Locate underground utilities like electric cables, Optical fiber cables (OFC), Pi. This Method Statement describes a proper work procedure shall be carried out during the excavation stage as per specification and contract drawings. There are specific activities defined as high risk construction work (HRCW). Any construction work (including any work connected with an ‘ excavation ’) that is carried out in or near: a shaft or trench with an excavated depth of greater than 1. It is used as a safety document to make sure that construction workers avoid hazards and risks in the workplace by conducting themselves safely.
It is a way to identify risks associated with a worksite and how best to manage them. SWMS) must be prepared. A construction method statement template is a type of work method statement used by the construction industry to manage work and ensure that necessary precautions are set and communicated to workers involved. Demolition is some of the most dangerous work conducted on sites all over the worl and there have been countless measures and controls put in place to try mitigate the risks and hazards associated with demolition works. Last Amended: Review Date: 14.
A great risk assessment and method statement starts with a good template. But a good template is only the beginning! Safe Work Method Statement developed and presented for evaluation and familiarisation or safety alerts discussed. So download the construction Word templates below, but remember how you fill it out is important not only to get you on site, but to keep you and everyone else safe.

Policy Statement As stated in the University’s Health and Safety Policy, the University of Connecticut is committed to providing a healthful and safe environment for all activities under its jurisdiction and complying with federal and state health and safety standards.