The following is a document of the Quality Control procedures related to reinforced concrete work of the Project. Machinery and Equipment 5. Personal Protective Equipment 5. Safety Arrangement during the foundation work 6. Survey and Setting out 6. Piles (where applicable) 6. Description of Works 1. Introduction This method statement defines the sequence and the control procedures for the repair of concrete defects which include but not limited to the following: 1. Honeycombing or Spalling 3. The purpose of this method statement is to lay down the systematic procedures for the various activities required for reinforcement bars to ensure that all works are carried out in accordance with the approved shop drawings and project specification. Reinforcement uniformly. Site Organisation and Control 2. Method Statement Contents 1. Pile Testing – Integrity Testing 6. Structural design Engineer shall also indicate the method statement. All reinforcement work shall be shall be executed in conformity with the drawings.
In this method , the cutting energy is produced electrically by heating a gas in an electric arc produced between a tungsten electrode and the workpiece. This ionises the gas, enabling it to conduct an electric current. The high-velocity plasma jet melts the metal of the work piece. This method permits speedily constructing a thin-walled reinforcement lining by applying pieces of steel plate (hereinafter referred to as “panels”) to the existing tunnel lining. We (the undersigned) have read and understood the attached method statement and will comply with the specified requirements and control measures.
Special requirements Steel reinforcement shall be prime as soon as possible, but not later then hours, after sand-blasting with S PRIMER (Epoxy Zinc Chromate Primer) or L. If the work activity changes or deviates from that originally envisage we will seek further advice and request an amended method statement. INSPECTION AND TEST PLAN APPENDIX – 12. Step – Carry out the concreting work to complete a cycle for typical floor.
Formwork erection and concreting cycle can have another option. That is, to complete the wall formwork and do the concreting to wall in an advanced stage. After that, carry out the work for the floor slab. Vehicles fitted with reversing alarms.
Adequate compound lighting vi. Soft surfaces lay hard-core or other temporary surfacing. It is primarily used in construction to describe a document that gives specific instructions on how to safely perform a work related task, or operate a piece of plant or equipment. The standard is divided into two parts.
Part I covers general requirements on materials, design, reinforcement , manufacturing, acceptance, repair, inspection and product marking. REs and RTOs will be able to pick up the necessary information from this guidebook for application in their daily work. We would also like to thank Er. Kok King Min for editing this Foundation Supervision Guide.
Appreciation is especially extended to members of the review committee (listed below) who provided guidance on the second edition of the document and whose input contributed to this work. Some works will require multiple method statements ) The reinforcement will be fixed as indicated on the design drawing and to the covers stated. A great risk assessment and method statement starts with a good template.
But a good template is only the beginning! So download the construction Word templates below, but remember how you fill it out is important not only to get you on site, but to keep you and everyone else safe. Hazard identification tool – Steel reinforcement fixing.