The distance from the centerline of the gas riser to the centerline of the first meter “drop” on the meter manifold will be 18” depending upon meter size. Subsequent meter drop centerlines will be 18” along the manifol with the manifold extending 18” past the final meter drop. Please refer to page for required clearances. A minimum of inches is required between the bottom of the meter and final grade.
The upstream regulator in a series must be located outside the building, unless it is located in a separate metering or regulating building.
Natural Gas and Propane Installation Code. These meters may be used for collecting energy consumption data or similar purposes. Gas meter regulator vent clearance to electrical devices such as switches, electrical receptacles, power disconnects. How long will a gas meter installation take? Where is the gas meter located?
Trench bottom shall be level, free of rocks, and deep enough to provide a mini-. Sand padding with suitable rock-free material is required six inches below and.
Pipe in the trench shall not be in contact with or any closer than inches to any. The current page is Gas Specifications Training and Events Webinars Technical Assistance E-Newsletters Electric Specifications Gas Specifications The “blue book” presents specifications and requirements relating to the connection and use of natural gas supplied from the National Grid Gas System. INSTALLATION REQUIREMENTS a) GENERAL REQUIREMENTS i) Service Lines (1) Service lines shall be buried with a minimum of inches of cover in private property and a minimum of inches of cover in streets and roads. They shall be installed in such a manner as to not subject connecting piping to undue strain, protected from physical and environmental damage, and at least three feet from a source of ignition.
Marked on attached Site Survey. Opposite garage feet back from front corner. On garage Other Location. What pressure is required at the meter ? For overhead service drops, the centerline of all meters shall be between and feet from the finished grade. There shall be a minimum distance of feet of unobstructed working space, measured from the meter face, in front of all electric and natural gas meters.
We require a 3-foot minimum separation between natural gas and electric facilities. METER LOCATION REQUIREMENTS 301. Only authorized CRA-ES personnel shall determine these locations.
Section 20 Paragraph 200. Orifice plate installation considerations Table 4. C Straight Pipe Requirements (1) Beta 0.
The preferred depth of cover for natural gas mains where final grade is established shall be a minimum of 24. When final grade is not yet establishe of cover should be provided. Call To Order Or Speak With An Expert Now! Fahrenheit or otherwise damage the meter.
On an exterior wall of the building. Meter sets should be. In order to set the meter , the heating system must be wire the thermostats installe and the permanent electrical power must be on. The flue pipe and all other necessary venting must be completed. Boilers and hot water tanks must be filled with water and permanent plumbing for this equipment must be in place.
Floor must be dirt to allow access to underground piping. Customer Requirements The customer’s fuel line is the pipe that connects to the outlet of the gas meter set and extends through the wall into the house. The fuel line should enter the house or structure within three (3) feet of the gas meter set.
Dominion Energy NC will install the service line from the street to your home. Digging is require but we will reseed the dig site and replace landscaping if necessary.