Construction method statement for excavation

Excavation , Earthwork and Filling Method Statement – Planning. What is excavation method statement? Permits from the concerned authority shall be obtained prior to start work at the site. Services, wherever found shall be rerouted and protected to place will not affect site activities. Quality Assurance Approval.

This procedure provides a standardised framework for the control of excavation , earthwork and filling to.

In any circumstances where specifications are not provided or they are in any way incomplete, the matter. A safe work method statement for excavation improves excavation operations in a number of ways. Firstly, it enables a company to document its actual process which requires thinking through and establishing the best and most feasible control measures.

Several methods are available to achieve excavation. In all methods, excavation safety plays a crucial role. Some popular methods of excavation are: 1. Horizontal Directional Drilling 4. Microtunneling for Pipe Jacking 5.

Pile foundations and diaphragm walls 6. Vibro stone columns 7. See full list on resources. Any open excavation deeper than 1. This method statement describes the excavation safety requirements and safe work procedure for all open excavations. It summarizes suggested method of executing works safely within any constraints. The scope of this document covers: 1. Safe work method and procedure for carrying open excavation works 2. Materials , equipment , and tools needed to carry out the excavation activity 3. Get relevant data of subsurface soil and water table location 2. Design excavation sides and protective system based on the size of excavation and type of soil.

Three popular methods to protect excavation sides are: 1. Finalize excavation and soil removal method namely mechanically or manual 2. Locate underground utilities like electric cables, Optical fiber cables (OFC), Pi. Make in simple for better understanding. Step 2: Site Details Mention the site name and the site address. The place where the construction will take place should.

Every excavation involves a number of hazards and risks such as service strikes and open trenches, and these hazards need to be managed and mitigated in order to keep people safe and projects moving forward.

Although above information is sufficient in order to develop and good method statement. But there are some clients who need detailed method statement mentioning lot of things. Construction Method Statement Example for Large Projects.

In that case you can use our sample method statement given below or follow below table of content. A construction method statement template is a type of work method statement used by the construction industry to manage work and ensure that necessary precautions are set and communicated to workers involved. However, the exact method to be adopted still depends upon a number of factors: 1. Nature of subsoil – affect type of machine used and the necessity of soil protection. Size of excavation – affect type of machine used and method to excavate.

Side of excavation will be cut back to safe slope. This Method Statement describes the works operation to undertake mass earthworks and sub grade construction that comply with the specified requirements for construction of new or widening of existing road under normal circumstances. The different methods available for dewatering of excavations at constructions sites are not necessarily interchangeable as each one has a narrow range of applications, therefore, adopting the right method of dewatering for a particular ground condition is always a critical and a difficult decision to make.